Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the dipi-divi-pixel domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/climakomfort/climakomfortpl/public_html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the hide-my-wp domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/climakomfort/climakomfortpl/public_html/wp-includes/functions.php on line 6121
Flextronics office and warehouse building - CLIMA KOMFORT

    Office and warehouse building

    Flextronics in Tczew

    Flextronics International Poland
    investor

    Clima Komfort
    contractor

    Tczew
    location

    office-storage
    building type

    • 52.000 m3/h
      air
    • 9 air handling units
    • 18 units
      air conditioning
    • 9.000 m2 area
    • 110 kW
      total power
    • 80.000 m3
      volume

    Production complex located in the Pomeranian Special Economic Zone consisting of four buildings.

    SCOPE OF WORK PERFORMED

    Comprehensive installation of mechanical ventilation, domestic ventilation and a VRF air conditioning system based on the Multi V unit from LG Electronics. Our company also comprehensively executed control automation systems for all the HVAC systems installed.

    sięgamy coraz wyżej