Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the dipi-divi-pixel domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/climakomfort/climakomfortpl/public_html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the hide-my-wp domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/climakomfort/climakomfortpl/public_html/wp-includes/functions.php on line 6121
GC Skwer office building - CLIMA KOMFORT

    Office building

    GC Skwer

    GC Skwer Sp. z o.o.
    investor

    Clima Komfort
    contractor

    Toruń
    location

    office
    building type

    • 23.000 m3/h
      air
    • 4.000 m2
      area
    • 160
      air conditioning units
    • 14.000 m3
      volume
    • 430 kW
      cooling power

    The modern office building combines state-of-the-art technical and structural solutions with unique interior architecture.

    SCOPE OF WORK PERFORMED

    Design and comprehensive execution of mechanical ventilation, smoke extraction, aeration, process heat, and heating and air-conditioning systems based on the Multi V air-conditioning system, together with a complete automation system for air-handling units and VRF systems, allowing electricity to be billed to individual tenants.