Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the dipi-divi-pixel domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/climakomfort/climakomfortpl/public_html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the hide-my-wp domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/climakomfort/climakomfortpl/public_html/wp-includes/functions.php on line 6121
Condohotel SolMarina - CLIMA KOMFORT

    Condohotel

    SolMarina

    Dekpol Developer investor
    Dekpol Construction general contractor

    Gdansk
    location

    condohotel
    building type

    • 8
      air handling units
    • 30,000 m3/h
      airflow
    • 400 kW
      cooling power
    • 1,500m2
      floor heating system
    • 150
      radiators
    • 175
      air conditioning unit

    Condohotel Sol Marina located on the waterfront of the Dead Vistula River near Sobieszewo Island. 130 hotel rooms and 15 suites, restaurant and spa with swimming pool.

    SCOPE OF WORK PERFORMED

    The scope of our work included comprehensive execution of sanitary installations – ventilation based on 8 VBW air handling units, LG air conditioning system with 8 cooling units and 175 indoor units, heating (2 Buderus gas boilers, 16 floor heating manifolds, with mixing set and control automation, together with 1500 m2 of floor heating) and water and sewage systems.

    we reach higher and higher