Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the dipi-divi-pixel domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/climakomfort/climakomfortpl/public_html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the hide-my-wp domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/climakomfort/climakomfortpl/public_html/wp-includes/functions.php on line 6121
Rychiger manufacturing plant - CLIMA KOMFORT

    Production facility

    Rychiger

    Rychiger Poland Sp.
    z o.o.
    investor
    K3 general contractor

    Grudziądz
    location

    manufacturing
    building type

    • 2
      air handling units
    • 21,230 m3/h
      airflow
    • 292 kW
      cooling power
    • 5,000m2
      area
    • 4
      chillers
    • 6.5 ha2
      plot area

    Manufacturing facility with office and warehouse part located in Grudziadz.

    SCOPE OF WORK PERFORMED

    The scope of our work included the construction of mechanical ventilation for living and technological purposes based on VBW Engineering air handling units and LG air conditioning system.